Welcome to EARTHQUAKE,

EARTHQUAKE ›› 2009, Vol. 29 ›› Issue (4): 72-82.

Previous Articles     Next Articles

Wellhead Equipment Reonstruction of the Liaogu-1 Well and Analysis of its Observation Effect

WANG Hua, WANG Wei, CHEN Qi-feng, WEI Ru-qing, LIYue-qiang, ZHAO Jie-feng Feng En-guo   

  1. Liaocheng Hydrochemical Seismostation, Liaocheng 252000, China
  • Received:2009-06-11 Revised:2009-07-25 Online:2009-10-31 Published:2021-10-15

Abstract: Through the reonstruction of the wellhead equipment of the Liaogu-1 Well, in Shandong province, we have realised the synthetical observation of subsurface fluid under the condition of artifical automatic flow. After observation for more than one year, it has been indicated that most of the observation items could be observed unceasingly. The dynamic character obtained after reonstruction was consistent to that obtained under the condition of natural automatic flow.

Key words: Liaogu-1 well, Subsurface fluid, Wellhead equipment, Exploitation of hot water

CLC Number: